Export
Main guide
How do you build a hospital abroad with systems made in Italy?
A hospital abroad built with systems made in Italy is delivered in six stages: analysis of local regulations and site conditions, detailed design and documentation, manufacturing and testing at the plant, packing and shipping, installation and testing on site, and support after handover. Prefabrication reduces reliance on local labour and brings quality checks forward, before shipping. ADAM follows this process from Bernate Ticino for sites in over 40 countries.
Updated on
